Work day this Saturday 31st May

There is a workday this Saturday at the community garden 10:00-14:00. We will be finishing off the ecopaving surface of the car park and looking at the polytunnel frame. There are also some willows to plant. WE NEED YOUR HELP!! Please do come along to see the site, have a chat or lend a hand … Continue reading

Ecopaving and out

We had a good work day on Saturday laying the ecopaving for the car park. The paving is made from recycled plastic and will provide a good durable surface that will blend into the garden once some grass gets established. We had a load of sand delivered the day before and spread this over the … Continue reading

Work day Sat 17th May

There is a workday this Saturday (17th May) 9am – 1pm. The plan is to get the car park ecopaving laid. This will require a concerted effort for the morning so please come along if you can help out. We need to spread sand over the existing hardstanding, lay the recycled ecopaving and then spread … Continue reading

Foundations in place

Great progress was made on Saturday for the work day (3rd May). The concrete lorry arrived just after 9am and tipped the load onto some plastic. Then the race was on to set the ground stays for the polytunnel. We hired a motorised wheelbarrow which helped move the concrete across the field to the site. … Continue reading

CORRECTION – work day tomorrow! 3rd May

The date was wrong in the last post! hope to see you tomorrow (9:00 – 14:00)

Work day 3rd May

We have another work day this Saturday (3rd May) 9:00-14:00. We have an early start this week as the readymix concrete arrives at 9am to pour into the polytunnel foundations. We are hiring a motorised wheel barrow to get the concrete to the polytunnel site. The ground stays need to be set accurately using the … Continue reading